EMS Bay Overhaul April 2016

Our old bay now being used for the two ambulances , brush truck and utility was showing wear and tear.  The floor was cracking.  One corner was collapsing needing repair.  We employed Floor Coatings from New Castle, DE to do the job.

They built up the corner and smoothed it out.  All cracks were filled and 3 layers of surfacing were installed.  Cracks along the wall were filled and a 4″ integral cove base was installed.

This was our time to rearrange and pitch some unneeded stuff.  New wall cabinets will go up and old torn down. The bath will get a new cabinet and tile for the shower.

20160417_100117_resized 20160417_100145_resized 20160417_100336_resized 20160417_100347_resized 20160417_100546_resized 20160417_103624_resized 20160417_103640_resized 20160418_140846_resized 20160418_141331_resized_1 20160418_161254_resized 20160418_161728_resized (1) 20160418_171610_resized 20160418_171717_resized_1 20160418_141210_resized 20160426_151840_resized 20160426_151856_resized (1) 20160426_151914_resized

The results are a great improvement and make the building look new.  We are very happy with the work done.

 